Jiangsu Weijinmai Technology Co., Ltd. was established on April 11, 2023, with a registered capital of 100 million yuan and an area of 192.94 acres. It is a new material technology company that integrates the research and development, production, and sales of metal functional materials. The company, together with new energy material users, is committed to solving the bottleneck problem of new energy metal functional materials, breaking through the international monopoly in this field, striving to build a national demonstration base for new industrialization industry, promoting the transformation and upgrading of China's new material industry, and contributing to China's ranks as a "new material" powerhouse, Strive to become a global supplier of new energy metal functional materials.
The total investment of the project is planned to be 200 million yuan, with a new factory and office building of 88000 square meters. It is planned to build a high-end intelligent green factory project with an annual output of 300000 tons of special materials for new energy battery shells and an annual output of 3000 tons of ultra-thin battery positive electrode copper foil strip. The project includes two high-speed continuous nickel plating units, two continuous annealing alloying units, one leveling unit, two heavy coil and longitudinal shear comprehensive lines, and twelve ultra-thin battery positive electrode copper foil strip production lines The intelligent factory fully automatic unmanned warehouse feeding system, as well as supporting public and auxiliary facilities such as power supply and distribution facilities, water treatment systems, and nitrogen production facilities. The project is planned to be constructed in two phases. In the first phase, a production line for specialized materials for new energy battery shells with an annual output of 50000 tons is planned for technical renovation (to be put into operation in November 2023), and a new production line for specialized materials for new energy battery shells with an annual output of 150000 tons is planned for construction. It is expected to be put into operation before the end of 2024, and after production, it can achieve an annual industrial invoicing sales of over 200 million yuan; The second phase plans to construct specialized materials for new energy battery shells with an annual output of 150000 tons and copper foil strips for ultra-thin battery positive electrodes with an annual output of 3000 tons. It is expected to be put into production by the end of 2026. After all the first and second phases are put into operation, they can achieve an annual industrial invoicing sales of over 45 million yuan.